Chloride profiles - 6 months
Chloride profiles measured on
drilled cores from the 15 concrete blocks placed at the Fehmarnbelt
exposure site are presented below. The profiles were measured after
approximately six months (203 days) of exposure to the marine
environment, and for each block, two cores were drilled, i.e. one
from below sea level and one from the splash zone.
All profiles were obtained
according to the method described in DS 423.28:1984
Testing of concrete - Hardened concrete - Chloride content,
and the data presented below have not been corrected for variations
in aggregate packing near the concrete surface.