Chloride profiles measured on drilled cores from the 15 concrete blocks placed at the Fehmarnbelt exposure site are presented below. The profiles were measured after approximately six months (203 days) of exposure to the marine environment, and for each block, two cores were drilled, i.e. one from below sea level and one from the splash zone.

All profiles were obtained according to the method described in DS 423.28:1984  Testing of concrete - Hardened concrete - Chloride content, and the data presented below have not been corrected for variations in aggregate packing near the concrete surface.

 
Fehmarn_chloride profiles _6 months_A

 

 

Fehmarn_chloride profiles _6 months_B

 

 

Fehmarn_chloride profiles _6 months_C

 

 

Fehmarn_chloride profiles_6 months_D

 

Fehmarn_chloride profiles_6 months_E

 

Fehmarn_chloride profiles_6 months_F

 

 

Fehmarn_chloride profiles_6 months_G

 

 

Fehmarn_chloride profiles_6 months_H

 

 

Fehmarn_chloride profiles_6 months_I

 

 

Fehmarn_chloride profiles_6 months_J

 

Fehmarn_chloride profiles_6 months_K

 

Fehmarn_chloride profiles_6 months_L

 

Fehmarn_chloride profiles_6 months_M

 

 

Fehmarn_chloride profiles_6 months_N

 

 

Fehmarn_chloride profiles_6 months_O